Because you are My DIS friends. And I learn many great ideas from here.
it was started during our trip. Gutted and will be rebuilt for future older selves.
It was a horrible dust mess throughout the house when they removed the tub and the blown in insulation fell down. Our guy said he was going to put up plastic to shield the other rooms and he did not. Dust is literally everywhere. Ah well. Still cleaning.
2 weeks for them to make the shower base and then come back to measure the walls. We have iron in our water and we found a local place that installs stain resistant to iron. Wish us luck. Prior only saw this online product in California.
They sledge hammered out the old tile. More dust.
Yesterday I painted the closet. Today I sanded a small place on the ceiling. I will attempt to apply that texture stuff in a small area and I will paint the ceiling today.
I will paint the closet shelves today.
Our guy does not care what you do to lessen his job. His son in law does the electrical. Our friend does the plumbing.
We removed those 2 big old wall mirror prior to us leaving and I prepped the walls to be painted with the 3 steps after that adhesive comes off. The place is still in business where the mirrors came from so they took them back into their garbage .
They think 5 weeks but I bet 6.
Thankfully we have 2 other working bathrooms. And the week we left. DH decided to tile the closet. So out everything had to go! And we had to count the tile to make sure we had enough.
I had gotten a fantastic accident deal on it a year prior.
it was started during our trip. Gutted and will be rebuilt for future older selves.
It was a horrible dust mess throughout the house when they removed the tub and the blown in insulation fell down. Our guy said he was going to put up plastic to shield the other rooms and he did not. Dust is literally everywhere. Ah well. Still cleaning.
2 weeks for them to make the shower base and then come back to measure the walls. We have iron in our water and we found a local place that installs stain resistant to iron. Wish us luck. Prior only saw this online product in California.
They sledge hammered out the old tile. More dust.
Yesterday I painted the closet. Today I sanded a small place on the ceiling. I will attempt to apply that texture stuff in a small area and I will paint the ceiling today.
I will paint the closet shelves today.
Our guy does not care what you do to lessen his job. His son in law does the electrical. Our friend does the plumbing.
We removed those 2 big old wall mirror prior to us leaving and I prepped the walls to be painted with the 3 steps after that adhesive comes off. The place is still in business where the mirrors came from so they took them back into their garbage .
They think 5 weeks but I bet 6.
Thankfully we have 2 other working bathrooms. And the week we left. DH decided to tile the closet. So out everything had to go! And we had to count the tile to make sure we had enough.
I had gotten a fantastic accident deal on it a year prior.